Dirt · spoils · concrete · asphalt

Haul-Off

Dug a foundation, a septic, a pool or a pond, and now there's a pile? CAD hauls it off by the load: dirt, clay, spoils, clean fill, broken concrete and asphalt.

A CAD Hauling dump truck parked beside an excavator and piles of dirt under a clear blue sky
What can go on the truck

Tell us what's in the pile

What it is decides where it can go. Clean loads are simple. Mixed loads take a conversation first.

Routine

Dirt and spoils

From foundations, septic and utility digs, ponds, pools and grading. Clay, subsoil, sod, topsoil.

Routine

Clean fill

Soil, stone, gravel and sand with nothing else mixed in.

Routine

Concrete and asphalt

Broken slabs, sidewalks, old driveways, curbs and millings.

Ask first

Something else

Stumps, brush, roots, mixed demolition debris. Put it on the ticket. Whether CAD can take it depends on where it can legally be dumped.

How a haul-off works

Three questions, then a truck.

Answer these on the ticket and the callback is short.

1

What is it, and how much?

Say what's in the pile and give a size: loads, yards, or just the length, width and height of the pile.

2

How does it get loaded?

A dump truck doesn't load itself. If there's an excavator, skid steer or loader on site, we're set. If there isn't, say so and we'll talk it through.

3

Where does it go?

If you have a place for it, put that on the ticket. If you don't, say so, and the callback covers a place to dump it.

Sizing the pile

How many loads is that?

A tri-axle takes roughly 14 to 16 yards of dirt a trip. Wet clay is heavy and may go out in smaller loads.

Measuring a pile: multiply length by width by height in feet, take half (piles are peaked, not square), and divide by 27. A pile 20 feet long, 10 feet wide and 4 feet high is about 15 yards: one load.

Measuring a hole that isn't dug yet: dirt fluffs up when it comes out of the ground. A hole that measures 10 yards makes 12 or 13 yards of pile.

Not sure? Send a photo with the ticket and something in the frame for scale: a person, a shovel, a pickup.

Good to know

Keep it clean.

Dirt with trash, wood, roots or rubble mixed in costs more to get rid of, and some places will turn it away. If you're still digging, keep the dirt in one pile and everything else in another.

  • 1
    Firm ground to sit on

    The truck gets heavier with every bucket. It needs solid ground while it's loaded and a way out with 20 tons on.

  • 2
    Room to get in and out

    Narrow drives, tight turns and low wires on the way in: flag them on the ticket.

Common questions

Asked on most calls

Do you bring a machine to load it?

CAD runs dump trucks. If you or your contractor has an excavator, skid steer or loader on site, that's the usual way a truck gets loaded. If nobody does, say so on the ticket and CAD will talk through the options with you.

Can I get a price online?

No. Haul-off is quoted on the callback because the price depends on what the material is, how many loads there are and how far it has to go. Send the ticket and you'll have a time and a price back fast.

I'm a contractor with spoils coming off a job. Can you keep trucks cycling?

That's hourly work. Book it under Trucks by the Hour and tell us the dates, the site and who's loading.

Ready when you are

Send the pile.

What it is, how big, where it sits and how it gets loaded. A photo helps. CAD calls or texts back with a time and a price.